|
Hilton Garden Inn
Indianapolis, IN
15 stories
165 suites
Renovation of historic office
Mechanical systems were designed for:
- Compliance with ASHRAE 62 fresh air ventilation standards
- Air-to-air heat recovery for building exhaust and pool room ventilation
New building services included:
- Wet stand pipes and full sprinkler protection system
- Emergency generator
- DDC HVAC control system
- Fire alarm system
- VAV system boxes and air handlers for conference center and atrium
- Four pipe fan and coil units for suites
- Lighting
- Electrical service
- Sanitary and vent piping
- Domestic hot and cold water distribution
MNA responsibilities included:
- Consultant mechanical
- Electrical
- Plumbing design
- Integrated accessible ceiling plan into the corridor hard ceiling planned by the architect to maintain access to important mechanical systems
Download project data sheet
|