Lafayette, Indiana

MNA designed a HVAC system for a 1.6 million+ square foot facility.  Design began in May of 2007 and the finished system was commissioned in May of 2008.  A complete system from conceptual design to completion was 12 months.

  • HVAC design for Large Engine Manufacturer
  • Industrial Plant
  • 1.6 Million+ sf